SBS Panel Square Foot Costs
Scenario #1
Costs for a 16' wide by 24' tall panel (384 square feet) load
bearing wall using 6" studs on 16" centers
MATERIALS
|
ITEM |
DESCRIPTION |
UNIT |
AMT |
COST |
TOTAL |
SF
COST |
|
Studs & Track |
15/8" x 6" x 16ga on 16"
OC 13 @ 24' LF |
LF |
344 |
$1.80 |
$619.20 |
$1.61 |
|
Mesh |
384 sf + 24 sf for
laps |
SF |
408 |
$0.13 |
$53.04 |
$0.14 |
|
Cable |
For lift points 4
ea |
LF |
24 |
$0.50 |
$12.00 |
$0.03 |
|
Screws |
For framing the
panel |
SF |
384 |
$0.04 |
$15.36 |
$0.04 |
|
Anchors |
Threadall and epoxy 9
ea |
EA |
9 |
$3.00 |
$27.00 |
$0.07 |
|
Bolts |
Panel bolts &
Washers |
EA |
15 |
$1.00 |
$15.00 |
$0.04 |
|
Forms |
Forming Lumber |
LF |
80 |
$1.25 |
$100.00 |
$0.26 |
|
Bond Breaker |
Bond breaker &
Cure |
SF |
384 |
$0.08 |
$30.72 |
$0.08 |
|
Concrete |
3500# 3/8 @ 2" + 5 yd
for picks |
CY |
2.87 |
$65.00 |
$186.55 |
$0.49 |
|
Patch |
Sack and Patch
Material |
SF |
384 |
$0.03 |
$11.52 |
$0.03 |
| |
|
|
|
Total |
$1,070.39 |
$2.79 |
LABOR
|
ITEM |
DESCRIPTION |
UNIT |
AMT |
COST |
TOTAL |
SF
COST |
|
Frame |
Fabricate 15 pcs - 2 men
3 hour ea |
HRS |
6.6 |
$30.00 |
$198.00 |
$0.52 |
|
Form |
Form 80' LF Ð 2 men 1.5
hour ea |
HRS |
3 |
$30.00 |
$90.00 |
$0.23 |
|
Mesh |
Cut & Tie 384 sf Ð 2
men .75 hour ea |
HRS |
1.5 |
$30.00 |
$45.00 |
$0.12 |
|
Picks |
Install 4 pcs cable Ð 1
man hour |
HRS |
1 |
$30.00 |
$30.00 |
$0.08 |
|
Place concrete |
Pour & float 2.87 cy
Ð 4 men 1 hour ea |
HRS |
4 |
$30.00 |
$120.00 |
$0.31 |
|
Patch |
1 man 2 hour |
HRS |
2 |
$30.00 |
$60.00 |
$0.16 |
|
Erect |
4 men .5 hour
ea |
HRS |
2 |
$30.00 |
$60.00 |
$0.16 |
|
Anchors |
9 bolts 10 min ea Ð 1.5
hour |
HRS |
1.5 |
$30.00 |
$45.00 |
$0.12 |
| |
Total
Labor |
HRS |
21.6 |
TOTALS |
$648.00 |
$1.69 |
EQUIPMENT & SUBS
|
ITEM |
DESCRIPTION |
UNIT |
AMT |
COST |
TOTAL |
SF
COST |
|
Pump |
Concrete Pump |
YDS |
2.87 |
$13.00 |
$37.31 |
$0.10 |
|
Crane |
$200 Per Hour |
HRS |
0.6 |
$200.00 |
$120.00 |
$0.31 |
|
Braces |
Brace Rent for 24' H $24/Month Each |
EA |
2 |
$24.00 |
$48.00 |
$0.13 |
|
Vert Joints |
Backer Rod and
Caulk |
LF |
24 |
$3.00 |
$72.00 |
$0.19 |
| |
Total
Equipment |
|
|
|
$277.31 |
$0.72 |
RECAP SF COSTS FOR 16L X 24H PANEL
|
ITEM |
DESCRIPTION |
UNIT |
AMT |
COST |
TOTAL |
SF
COST |
|
Materials |
|
|
|
|
$1,070.39 |
$2.79 |
|
Labor |
|
|
|
|
$648.00 |
$1.69 |
|
Equipment |
|
|
|
|
$277.31 |
$0.72 |
|
Use Fees |
SBS Royalties |
|
|
|
$384.00 |
$1.00 |
| |
Total Panel
Cost |
|
|
|
$2,379.70 |
$6.20 |
Scenario #2
Costs for a 16' wide by 24' tall panel (384 square feet) load
bearing wall using 8" studs on 24" centers
MATERIALS
|
ITEM |
DESCRIPTION |
UNIT |
AMT |
COST |
TOTAL |
SF
COST |
|
Studs & Track |
15/8" x 8" x 16ga on 24"
OC 9 @ 24' LF |
LF |
248 |
$1.95 |
$483.60 |
$1.26 |
|
Mesh |
384 sf + 24 sf for
laps |
SF |
408 |
$0.13 |
$53.04 |
$0.14 |
|
Cable |
For lift points 4
ea |
LF |
24 |
$0.50 |
$12.00 |
$0.03 |
|
Screws |
For framing the
panel |
SF |
384 |
$0.04 |
$15.36 |
$0.04 |
|
Anchors |
Threadall and epoxy 9
ea |
EA |
9 |
$3.00 |
$27.00 |
$0.07 |
|
Bolts |
Panel bolts &
Washers |
EA |
15 |
$1.00 |
$15.00 |
$0.04 |
|
Forms |
Forming Lumber |
LF |
80 |
$1.25 |
$100.00 |
$0.26 |
|
Bond Breaker |
Bond breaker &
Cure |
SF |
384 |
$0.08 |
$30.72 |
$0.08 |
|
Concrete |
3500# 3/8 @ 2" + 5 yd
for picks |
CY |
2.87 |
$65.00 |
$186.55 |
$0.49 |
|
Patch |
Sack and Patch
Material |
SF |
384 |
$0.03 |
$11.52 |
$0.03 |
| |
|
|
|
Total |
$934.79 |
$2.43 |
LABOR
|
ITEM |
DESCRIPTION |
UNIT |
AMT |
COST |
TOTAL |
SF
COST |
|
Frame |
Fabricate 11 pcs - 2 men
3 hour ea |
HRS |
6 |
$30.00 |
$180.00 |
$0.47 |
|
Form |
Form 80' LF Ð 2 men 1.5
hour ea |
HRS |
3 |
$30.00 |
$90.00 |
$0.23 |
|
Mesh |
Cut & Tie 384 sf Ð 2
men .75 hour ea |
HRS |
1.5 |
$30.00 |
$45.00 |
$0.12 |
|
Picks |
Install 4 pcs cable Ð 1
man hour |
HRS |
1 |
$30.00 |
$30.00 |
$0.08 |
|
Place concrete |
Pour & float 2.87 cy
Ð 4 men 1 hour ea |
HRS |
4 |
$30.00 |
$120.00 |
$0.31 |
|
Patch |
1 man 2 hour |
HRS |
2 |
$30.00 |
$60.00 |
$0.16 |
|
Erect |
4 men .5 hour
ea |
HRS |
2 |
$30.00 |
$60.00 |
$0.16 |
|
Anchors |
9 bolts 10 min ea Ð 1.5
hour |
HRS |
1.5 |
$30.00 |
$45.00 |
$0.12 |
| |
Total
Labor |
HRS |
21 |
TOTALS |
$630.00 |
$1.64 |
EQUIPMENT & SUBS
|
ITEM |
DESCRIPTION |
UNIT |
AMT |
COST |
TOTAL |
SF
COST |
|
Pump |
Concrete Pump |
YDS |
2.87 |
$13.00 |
$37.31 |
$0.10 |
|
Crane |
$200 Per Hour |
HRS |
0.6 |
$200.00 |
$120.00 |
$0.31 |
|
Braces |
Brace Rent for 24' H $24/Month Each |
EA |
2 |
$24.00 |
$48.00 |
$0.13 |
|
Vert Joints |
Backer Rod and
Caulk |
LF |
24 |
$3.00 |
$72.00 |
$0.19 |
| |
Total
Equipment |
|
|
|
$277.31 |
$0.72 |
RECAP SF COSTS FOR 16L X 24H PANEL
|
ITEM |
DESCRIPTION |
UNIT |
AMT |
COST |
TOTAL |
SF
COST |
|
Materials |
|
|
|
|
$934.79 |
$2.43 |
|
Labor |
|
|
|
|
$630.00 |
$1.64 |
|
Equipment |
|
|
|
|
$277.31 |
$0.72 |
|
Use Fees |
SBS Royalties |
|
|
|
$384.00 |
$1.00 |
| |
Total Panel
Cost |
|
|
|
$2,226.10 |
$5.80 |